Before Your Builder Starts: Essential Checks
A practical pre-start checklist covering permissions, drawings, consultants and contractor responsibilities.
The essential position
Before work begins, check more than the planning decision. A workable start requires the right approvals, coordinated technical information, agreed responsibilities and a written record of what the contractor will deliver.
Key points
- Check conditions and any separate consents before commencement.
- Confirm technical design and building control arrangements.
- Record site access, insurance, welfare and neighbour arrangements.
1. Confirm permissions and conditions
Read the planning decision notice alongside the approved drawings. Highlight every condition that needs approval before commencement, and identify any changes that may need a planning amendment. Do not assume a planning approval also authorises work under Building Regulations.
Check listed building consent where relevant, separate approvals for trees or highways, and whether a lease or covenant creates a private restriction. A permission can be valid in planning terms while another consent remains outstanding.
- Planning decision and approved plans
- Pre-commencement condition tracker
- Other legal and property consents
2. Check the technical information
Agree the building control route and the drawings, specifications and calculations the chosen contractor requires. Confirm who designs temporary works and any specialist installations. Structural engineering information, ground conditions, drainage and fire safety can materially affect the method of construction.
Ask each consultant to confirm the scope of their appointment. A planning drawing is not a substitute for a coordinated technical package, and a contractor's pricing assumptions should not silently become design decisions.
- Building Regulations submission
- Structural and drainage information
- Construction details and specialist design responsibilities
3. Put the construction agreement in writing
Confirm scope, exclusions, programme, payment stages, insurance, variations, access arrangements and how queries will be answered. Check the builder's insurance and relevant experience rather than relying only on a headline quotation.
Agree how the home will be protected, where materials and waste will be stored and whether services, bathroom facilities or kitchen access will be interrupted. The contractor must plan site safety and welfare; the household should know what areas are unsafe.
- Signed contract and priced schedule
- Insurance and programme
- Protection, welfare, access and neighbour arrangements
4. Make a simple go/no-go decision
Hold one final check before excavation or demolition. Record outstanding approvals, lead times, outstanding investigations, long-delivery materials and the person accountable for each action.
Do not start a notifiable element of work simply because the builder is available. The financial consequences of a premature start can be larger than the delay avoided.
- No unapproved pre-commencement conditions
- Clear design responsibility
- Written start authorisation
Questions homeowners commonly ask
Does planning approval mean I can start work?
No. Conditions, building control requirements and other consents can remain outstanding.
Who checks whether the builder is ready?
The client should agree clear responsibilities with the contractor and appointed designers. The extent of any architectural site-stage service must be separately agreed.
Official guidance and further reading
Get project-specific advice.
Every property has a different planning history, physical context and technical risk. Start with a focused review before committing to work.